Graham Swamp Trail & Pedestrian Bridge over SR 100

Client: Flagler County

ETM provided Construction, Engineering, and Inspection on the construction phase of the Graham Swamp Trail and Pedestrian Bridge over SR 100, dubbed the Flagler Greenways Pedestrian Bridge.

The paved trail and elevated boardwalks establishes a seamless connection between Lehigh Trail and the future Bulow Trail, as well as the proposed Bulow Creek Headwaters Park.

One of the signature features of the pedestrian bridge is an a-frame safety enclosure, which serves the dual purpose of adding aesthetic appeal while simultaneously fulfilling safety requirements.

Additionally, the project included a sidewalk along the south of SR 100 to connect with the existing sidewalk along Old Kings Road, offering greater convenience to pedestrians.

The Contractor for this project was Masci General Contractors, Inc. The Engineer or Record was Kisinger Campo & Associates.

This project was completed in July 2023.

Awards:

Scroll to Top